Free on site quote
Fixed price in writing
Fully insured
16 years on the tools
Retaining walls and fencing across Perth
We clean up before we go
Free on site quote
Fixed price in writing
Fully insured
16 years on the tools
Retaining walls and fencing across Perth
We clean up before we go
Free on site quote
Fixed price in writing
Fully insured
16 years on the tools
Retaining walls and fencing across Perth
We clean up before we go
Free on site quote
Fixed price in writing
Fully insured
16 years on the tools
Retaining walls and fencing across Perth
We clean up before we go

Home / Fences

Reliable Fence Builders in Perth

Colorbond, pinelap and timber, gates and pool fencing. Posts go in concrete, panels go up square, and if the fence sits on a retaining wall we build both in the same visit.
Finished Colorbond boundary fence in Perth
Fully insured
16 years on the tools
Owner on every job
Site left clean

Types of
fencing we install

Boundary fences, gates and pool fencing. Tell us the run and we will price it.
Colorbond fencing installed in Perth

Colorbond fencing

Steel sheet fencing in the standard colour range. Posts in concrete, no gaps, no rattle.
Colorbond fencing
Pinelap and timber fencing installed in Perth

Pinelap and timber fencing

Treated pine panels, built square and braced properly so they stay that way.
Pinelap and timber fencing
Gates installed in Perth

Gates

Made to fit the gap you have. Sliding, swing, double or just for walking through.
Gates
Pool fencing installed in Perth

Pool fencing

Built to the WA pool barrier rules, so it passes inspection the first time.
Pool fencing
How we build

How we install fencing in Perth

Most fences that lean or rattle were rushed at the start. We set every post in concrete, check the line and the height as we go, and pack out the bottom rail where the ground falls away. It costs a bit more time and it is the difference between ten years and thirty.
Posts in concrete
Dug to depth, not knocked in and hoped for.
Straight and level
Strung and checked along the whole run.
Neighbour sorted
We can split the quote two ways for a boundary fence.
Old fence gone
Removed and carted away, not left in a pile.
Old leaning fence before replacement
Before
New Colorbond fence in the same spot
After

Our quote and
build process

01

Free quote on site

We come out, measure the run, check the levels and work out exactly what it needs.
Usually within 2 to 3 days
02

Fixed price in writing

One price for the lot, materials, labour and rubbish. Splittable with your neighbour.
Emailed same day or the next
03

Built and cleaned up

Posts one visit, panels the next once the concrete sets. Old fence goes with us.
Booked for a date, not a window
Old fence

Asbestos fence removal in Perth

Plenty of older Perth fences are asbestos sheet, and it is not something to pull down yourself. We remove and dispose of it properly, then put the new fence up in its place. Ask about it when we come out and we will price the removal with the fence.
Ask about removal
Repairs

Fence repairs in Perth

We repair as well as replace. A few loose sheets, a snapped post or a gate that has dropped is often a half day job. If the whole run is on its way out we will tell you that instead of patching it twice.
Get it looked at
Retaining wall built under a boundary fence in Perth
Retaining walls

Retaining walls under fencing

If your ground falls away along the boundary, the fence needs a retaining wall under it first. Retaining walls are the bulk of what we do, so we build both in the same visit.

Recent fencing projects in Perth

View the gallery →
Colorbond boundary fence in Kingsley
Pinelap timber fence in Mundaring
Sliding driveway gate in Duncraig
Glass pool fence in Hillarys

Get a free
fencing quote

Tell us roughly what you need and we will come out, measure it and price it. No obligation, and we never pass your details on.
0438 690 856
Mon to Fri, 7am to 5pm · Saturdays by appointment

Fencing FAQs

A fence on the boundary is normally shared with your neighbour, half each for a basic fence. We can write the quote so it splits two ways and you both get the same paperwork, which makes the conversation next door a lot easier.

Most Perth councils allow a boundary fence up to 1.8 metres without an application, and front fences are usually limited to something lower with sight lines kept clear at the driveway. The rules differ council to council, so we check yours before quoting.

If it is a grey fibre cement sheet fence from before the 1990s, quite possibly. Do not break it or drill it. We will have a look when we come out, and we remove and dispose of it properly as part of the job.

A standard suburban run is usually one to two days, split over two visits because the post concrete needs to set before the panels go on. Removing an old fence first adds a day.

Pool barriers in WA have to meet the standard and your council inspects them. We build to those rules, so it passes the first time. Confirm the current requirements with your council, since they are updated from time to time.

Ready for a free quote in Perth?

Call now
Free quote